Move Scene 01 to Batch XY, move Scene 01 to Scene 02, then i loose this Scene in the Batch.

Could be nice when scene 1 where moved from scene 1 to scene 2, that it stays in the batch as scene 2.

So the applied batch can handle the different location of the scene that where moved into the batch.