Back-up updating to Master problem with sync?

I was testing some things today, so I was using by booth Cobalt 20 as a server and FOH as a back-up.

I started programming a look using the back-up.  I recorded an All Palette and then I recorded a preset.

I went to add some channels to the preset.  I used [UPDATE] & [Master Select].  The levels were added to the preset, but all of the attributes for other fixtures were set to 0% the levels remained where they were recorded.

When I homed all the attributes and fetched from the preset, I was able to rebuild it.

It happened again when I tried it with another preset.

I don't normally try and program from the back-up, but often use it for building palettes.

Thanks,

John