So Ive found that the EC may get a copy of the Job drawings for new installations,but the fellas doing the work rarely see it..
It would be nice if a booklet was made up that onsite labor could look at when running cable,wiring racks and such.
Ive been on several sites that the workers have all the information transfered from the drawings to a peice of cardboard. and forget important information like 2 additional 16 awg wires to go with uv1 through 6 or a 14awg ground wire.