Are there any potential problems that I may run against while running DL3's off of Generator power? Might there be a certain sequence of power up that I should be conscious of?
Generator power has proven to be problematic in the past for the DL fixtures. The motion side of things handles it just fine, but the computer server tends to get a bit upset.
The best thing that you can do is make sure all of the units are on power conditioners. This will ensure that everything operates smoothly.
Thank you for that. I have a furman power conditioner / regulator here. The output is 208 and the DL's currently have 110vt ends on them. Do the DL's auto switch to 208 or do I need to internally switch them?