Hi Guys
I've got a Hog 4 and Hog 4 Full boar.
i've got them to load the same show file though hog net, but can't seem to set them up so the Hog 4 is my main and the full boar the back up.
I want it so if the main loses power the back up takes over and outputs artnet.
I've got the switch between the 2 console on hognet, do i need to add a second switch for the Art net and somehow make it so the Full baor doesn't out put until the Hog 4 drops out?
I'm getting myself a bit confused on how to do this.