Hi all,
My school is currently going through it's Christmas assemblies and due to their ad-hoc nature I don't have the ability to program anything beforehand. I have built a magic sheet with a load of groupings, palettes and effects which allows me to busk, but I am having issues with timings.
I would like to have the ability to hold my changes until a point. and then play them when I am ready. Currently I tried to do that using macros to change the manual controls, but what I found is that the changes in the manual controls timings don't follow, so say I 'cue' up a colour palette with a fade time of 10 minutes then change it to 3 to fade it in, they are still controlled by the 10 minutes one.
Any ideas on how I can implement something similar to this?
Thanks,
Matt